Trucks sitting idle with nobody watching. Reports not filed. Specs not checked. Risks in the ground nobody flagged. Xora fixes the documentation gap — automatically, from voice notes, scans, and photos your team already takes.
Xora tracks every truck through a 7-state dispatch cycle. GPS geofencing detects load and dump events automatically. Idle time is separated from productive haul time — per truck, per cycle, all day.
A two-minute voice note on the way to the truck becomes a formatted daily report, a client update, and a materials request — automatically. He reviews and approves. Everything filed the same day.
Type the question the way you'd ask a senior engineer. Xora searches every indexed document simultaneously, surfaces the exact clause, flags conflicts, and gives you the citation to back your position.
Xora reads the geotechnical investigation report, maps every risk zone by depth and chainage, and generates the excavation procedure documentation you need before work starts.
Workers scan a QR tag on their vest or hard hat at the gate. Xora logs the timestamp, trade, and location. End of shift — one tap exports a payroll-ready CSV. No clipboards, no disputes.
Built by engineers with field experience on Ontario civil and underground projects. Every output is auditable, every record traceable, every approval logged — the way construction contract administration actually requires.
Every voice input, draft, edit, and approval logged with timestamp, user, and device. Defensible under Construction Act claims.
Foreman, superintendent, and PM — each with appropriate access, approval authority, and field restrictions.
OPSS, OBC, CSA, Ontario GDR — embedded from the start, not retrofitted after the fact.
No pitch. We walk you through what fits your operation and which problem is worth solving first.
We identify the one process costing the most time or exposure — usually fleet or daily reporting.
Single project, single system, measured results. No lock-in until you've seen the output yourself.
See the AI output firsthand. Flag anything to refine. Calibrate it to your project standards.
QR tag or WhatsApp. No app download. No training session. Record a voice note. Get a report.
Reporting running? Add fleet, crew, specs, or geotech — one at a time, on your timeline.
Ontario civil and excavation contractors. First report in under 24 hours. No lock-in.